Implementation Guide

Deployment Assumptions

Simple and practical requirements for a successful rollout.

CCTV Reuse Strategy

We prefer using existing IP cameras wherever possible to reduce infrastructure costs. New cameras are only added to cover critical blind spots in the production flow.

Strategic Camera Placement

Install points focus on "handover" zones: production checkpoints (start/end of line) and loading bay doors based on the specific facility layout.

AI Object Configuration

Vision models are pre-configured for standard object types (e.g., bottles, cases, pallets). Custom objects require a brief training period using sample footage.

Data Alignment for Demo

To ensure a relevant walkthrough, we align one example set: 1 Purchase Order, 1 Production Run, and 1 Dispatch Scenario matching client SKUs.

* Deployment typically takes 2-4 weeks depending on hardware readiness.